Hydrants_Farnham_From_Kipling_to_Wims (1)
Valves_Farnham_From_Kipling_to_Wims (2)
WaterPipe_Farnham_From_Kipling_to_Wims (3)
Fittings_Farnham_From_Kipling_to_Wims (4)
STM_Mains (6)
| > 250mm to 500mm |
| > 500mm to 1050mm |
| > 1050 |
OGS_Units (7)
| Approved - Not yet constructed |
Forcemain_in_progress (9)
SAN_Pressure_Sewer_in_progress (10)
Sanitary_Mains_in_progress (11)
Sanitary_Valve_in_progress (12)
SanS_Structure_in_progress (13)
Sanitary_Maintenance_Structure_in_progress (14)
Pumping_Stations_in_progress (15)
San_Laterals_in_progress (16)
Drying_Bed_in_progress (17)
San_Laterals_In_Progress_in_progress (18)
EX_CB_to_SAN_in_progress (19)
Sanitary_Sewer_Overflow_in_progress (20)
Oil_and_Grit_Separators_in_progress (22)
Catchbasins_in_progress (23)
Culverts_OSIM_in_progress (24)
Culverts_Urban_in_progress (25)
STM_Structures_in_progress (26)
Storm_HDW_in_progress (27)
STM_Maintenance_Structure_in_progress (28)
Storm_Valves_in_progress (29)
Stormwater_Inlets_in_progress (30)
Stormwater_Inlets_and_Outlets_in_progress (31)
Stormwater_Outfalls_in_progress (32)
Stormwater_Outlets_in_progress (33)
STM_Mains_in_progress (34)
LID_Facilities_in_progress (35)
Ditches_and_Swales_CLI_ECA_in_progress (36)
Culverts_CLI_ECA_in_progress (37)
STM_Catch_Basin_Leads_in_progress (38)
Culverts_in_progress (39)
Stormwater_Pumping_Stations_in_progress (40)
STM_Water_Facility_Polygons_in_progress (41)
|