{ "culture": "en-CA", "name": "", "guid": "", "catalogPath": "", "snippet": "Locations of corridors (Bell Boulevard Corridor, Bayview Mall/Dundas Street East Corridor, Dundas Street West Corridor, North Front/Highway 62 Corridor) as shown in Official Plan Schedule E-1", "description": "

3.9.2 Bell Boulevard Corridor <\/SPAN><\/P>

b) The Bell Boulevard Corridor is envisioned to evolve into a vibrant mixed-use corridor with three (3) unique districts, as identified on Schedule \u2018E-1\u2019: Bell Boulevard West<\/SPAN>, <\/SPAN>Bell Boulevard and Sidney Street Intensification<\/SPAN>, <\/SPAN>Quinte Mall <\/SPAN><\/P>

3.9.3 Bayview Mall/Dundas Street East Corridor <\/SPAN><\/P>

a) The Bayview Mall/Dundas Street East Corridor, as shown on Schedule \u2018E-1\u2019 and located generally along Dundas Street East, east of the City Centre to Haig Road, is a significant commercial area, characterized by a mix of commercial, industrial and low, medium, and high residential density land uses, generally geared to service the community. <\/SPAN><\/P>

3.9.4 Dundas Street West Corridor <\/SPAN><\/P>

a) The Dundas Street West Corridor is located generally along Dundas Street West, generally west of Wilkie Street to Avondale Road, as shown on Schedule \u2018E-1\u2019. This area has a mix of commercial uses generally intended to service the community, along with institutional and residential uses. <\/SPAN><\/P>

3.9.5 North Front/Highway 62 Corridor <\/SPAN><\/P>

a) The North Front/Highway 62 Corridor represents the major existing and developing arterial commercial strip that is intended to serve regional and local markets, as well as provide specialty services for the tourism sector. A variety of commercial land uses, ranging from highway commercial to general commercial and non-retail uses are located in this area.<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>", "summary": "Locations of corridors (Bell Boulevard Corridor, Bayview Mall/Dundas Street East Corridor, Dundas Street West Corridor, North Front/Highway 62 Corridor) as shown in Official Plan Schedule E-1", "title": "GIS.Official_Plan_Schedule_E1_Corridors", "tags": [ "OP", "Official Plan", "Land Use", "Corridor", "Planning", "Schedule E-1" ], "type": "", "typeKeywords": [], "thumbnail": "", "url": "", "minScale": 150000000, "maxScale": 5000, "spatialReference": "", "accessInformation": "Belleville GIS, Planning", "licenseInfo": "

This information displayed herein is intended as a reasonable representation of spatial and attribute data for personal, non-commercial use only and does not substitute a Legal Survey. By entering this on-line application the user acknowledges the following disclaimer and waiver of liability: The map is created from a subset of data from the City of Belleville Geographic Information System (G.I.S) database. The City of Belleville makes no claims, no representations, and no warranties, expressed or implied, concerning the validity, the reliability or the accuracy of the G.I.S data and G.I.S data products furnished, including the implied validity of any uses of such data. The City of Belleville, its employees, and agents shall not be liable for, and the user hereby waives, any claims for damages or loss arising directly or indirectly from the use, application or interpretation, of the information and maps provided on this web site by any party.<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>", "portalUrl": "" }